Sample projects
Every project delivered across hospitality, residential and administrative & commercial sectors — with the scope of work HG performed for the owner, contractor or third-party consultant on each engagement.
Name, location, and scope of work.
Filter by sector to see the projects HG has delivered in each category. Each entry details the role HG played and the exact services provided.

Hilton Hotel
Al Wakf City, Saudi ArabiaA 5-star hotel that includes 35 floors — restaurants, technical floors, three garages and eleven typical guest-room floors.
BIM and shop-drawing preparation delivered from HG's Cairo office to the main contractor for the Hilton Hotel in Al Wakf City, Saudi Arabia. HG produced the architectural, structural and MEP BIM model and coordinated shop drawings, which the owner received. No on-site supervision or time planning was provided.
View case study
Le Meridien Hotel — Cairo Airport
Cairo, EgyptA 349-room, 5-star hotel at Cairo International Airport spanning ~37,000 m² gross floor area — central building, east & west wings, ballroom, all-day dining, spa, cabana, bridge link and services building.
Project management services for the main contractor: planning, scheduling, time control, reporting and claims.
View case study
Hyatt Regency — Sharm El-Sheikh
Sharm El-Sheikh, EgyptA 490-room 5-star hotel with multiple guest-room blocks on different levels, presidential and regency suites, a ~15,000 m² main building, water features, staff housing and extensive landscaping.
Owner's in-house consultant for planning, scheduling, cost estimation and control, and contract administration across local and international design and construction management partners.
View case study
Royal Azur — Swiss Inn Hotel Resort
EgyptA 360-room 5-star hotel: 6,000 m² main building, 180-room staff housing, two swimming pools, diving centre, restaurants, GM villa, full engineering services and hardscaping.
Complete project management for the owner — consultant selection, design management and coordination, planning, procurement, cost control, full supervision and construction management across multiple contractors and suppliers.
View case study
Sheraton Sharm El-Sheikh
Sharm El-Sheikh, Egypt300-room hotel plus apartments, private villas, staff housing and a 3,546 m² shopping mall zone within a 21,447 m² main building and ancillary blocks.
Consultant to the National Bank of Egypt: estimation of total investment cost, value of work performed and remaining, plus progress reporting on time and cost performance.
View case study
Sharm Gardens — Sharm El-Sheikh
Sharm El-Sheikh, EgyptA 346-room 5-star hotel with a 7,740 m² main building, 10 luxury villas, 3,000 m² of pools, beach restaurant, diving centre, shopping and sports courts.
Complete construction management: scheduling, cost estimating, cash-flow forecasting, procurement, bid analysis and evaluation, time and cost control, and quality assurance.
View case study
Golf Porto Marina Resort
North Coast, EgyptAn Amer Group resort in Alamein on 1,185,187 m² — 18-hole golf area, 95 residential buildings, sports area, 5-star hotel and service buildings.
Complete project management for the owner: design management and coordination, planning, supervision and construction management.
View case study
Club Azur Hotel Resort
Hurghada, EgyptA 240-room 3-star hotel with swimming pools, staff housing, restaurants, theatre, shops and extensive landscaping and hardscaping.
Complete project management for the owner: designer selection, design management and coordination, planning, procurement, cost estimation and control, supervision, contract administration and construction management.
View case study
Bella Vista Hotel
Ain Al-Sokhna, EgyptA luxury 4-star hotel with ~120 rooms, main building, restaurants, swimming pool, entertainment areas, utilities, fences, external networks, roads and landscaping.
Project management for design and construction phases: design coordination, planning, scheduling, cost estimating, procurement, bid letting, contract administration and time & cost control.
View case study
High Gate Resort
EgyptA 300-room 5-star hotel of circular blocks around a centred main building, with swimming pools, facilities and support services.
Planning, scheduling, cost estimating, resource loading and cash-flow forecasting.
View case study
Oberoi — Giza
Giza, EgyptA luxury 5-star Oberoi hotel overlooking the Giza Pyramids plateau — guest-room wings, all-day dining, spa and pool decks set within landscaped grounds.
Full PM services: design management, planning and time control, cost management, safety, contract, risk, procurement, change and claims management.
View case study
Four Seasons — Madinaty
Madinaty, EgyptA 5-star Four Seasons hotel within the Madinaty master development — guest rooms, ballroom, F&B outlets and resort-style pools and gardens.
PM consultant: baseline programme (Primavera P6), WBS development, critical-path identification, resource histogram and S-curve, cash-flow analysis.
View case study
Mivida — Parcel 23
New Cairo, Egypt15 residential buildings alongside infrastructure, hardscape and exterior-furniture works.
Internal PM consultant to the general contractor: planning, scheduling, reporting, time and cost control, contract administration and claim analysis.
View case study
CFC — Festival Living 1 & 2
Cairo Festival City, Egypt15 mid-rise residential buildings within Cairo Festival City, delivered fully finished with central air-conditioning and wide-ranging apartment types set among vast green spaces.
Full PMC in construction: project administration, integration, scope, time, cost, quality, HR, communications, risk, change, claims and health & safety management.
View case study
Marassi — Blanca II & Blanca III
Sidi Abdul Rahman, North Coast, EgyptChalets, villas, master plan, infrastructure, roads, hardscape and swimmable lake — Blanca II across 3 zones and Blanca III across 7 groups with a central hub.
Internal PM consultant to the general contractor: planning, scheduling, reporting, time and cost control, contract administration and claim analysis.
View case study
Beta Green — Al-Mostakbal City
Al-Mostakbal City, EgyptVillas, twin houses, apartments, landscape, artificial lake, pools, social club, school, medical centre, commercial area, roads and infrastructure across 85 acres.
PM for design phase: design coordination and management, time management, contract administration, tendering, consultant and contractor procurement, cost estimation and budgeting, bid analysis and evaluation.
View case study
Administrative Capital R5 Residential
New Administrative Capital, EgyptA Khedival-Cairo-styled mixed-use development within the Ministry of Housing programme to expand new sustainable urban communities.
Internal consultant to the contractor: planning and time scheduling, cash-flow forecasting, resource allocation and levelling, time & cost claim preparation and performance measurement.
View case study
New Giza Complex
6th of October City, EgyptA luxury residential compound of villas, apartments and golf areas.
PM for a contractor building 29 residential buildings: planning, scheduling, reporting, and time & cost control.
View case study
Kattameya Hills
5th Settlement, New Cairo, EgyptA residential complex of 105 separate, attached and town-house villas with fences, external networks, roads, landscaping, lakes and service areas.
PM for the general contractor: planning, scheduling, and time & cost control.
View case study
Dyar Residential Complex
5th Settlement, New Cairo, Egypt~176 separate, attached and town-house villas with fences, external networks, roads, landscaping, lakes and service areas.
PM for the owner: planning, scheduling, and time & cost control.
View case study
Allegria Residential Complex
Sheikh Zayed City, EgyptA luxury residential, commercial and entertainment complex on the Cairo-Alex desert road with 340 villas, landscaping, lakes, services and golf area.
PM for the main contractor: planning, scheduling, reporting, time & cost control, and claims analysis.
View case study
Mountain View 3 & Diplomats
Ras Al-Hekma North Shore, EgyptLuxury beachfront communities on 121 acres — from excavation and networks through internal finishing and turnkey delivery.
Planning and controlling, progress measurement, procedure development, process implementation, PMO development and reporting.
View case study
Blu-Vert
New Administrative Capital, EgyptAn apartment complex in piece 8E of the New Administrative Capital comprising five Model A residential buildings.
PM services for the contractor: planning, procurement, cost estimation and control.
View case study
Royal City Residential Complex
Sheikh Zayed, Egypt500+ separate, attached and town-house villas with fences, external networks, roads, landscaping, lakes and service areas.
PM services for a contractor building 25 villas: planning, scheduling, time & cost control, and reporting.
View case study
Grand Residence Residential Complex
5th Settlement, New Cairo, Egypt298 villas — separate, attached and town-house — plus fences, external networks, roads, landscaping, lakes and services.
PM for the general contractor: planning, scheduling, time & cost control, and reporting.
View case study
Cairo Festival City Residential Complex
5th Settlement, New Cairo, EgyptA luxury residential, commercial and entertainment complex with 137 villas, offices, a large commercial centre, roads, landscaping and services.
Support to MACE consultants: evaluation of the commercial centre's time & cost position; planning, scheduling, forecasting and recommendations for future work.
View case study
Royal Meadows Park Residential Complex
Sheikh Zayed, Egypt376 separate, attached and town-house villas plus fences, external networks, roads, landscaping, lakes and services.
PM for the owner: planning, scheduling, and time & cost control.
View case study
Saudi Arabian National Guards Housing (SANG)
Al Madinah Al Monaurah, Saudi ArabiaA National Guard compound of 1,250 villas, 1,150 twin soldier types and 100 isolated officer types, ~1.294 bn SAR — subcontractor scope covered close-out and fine finishing for 400 soldier villas.
PM for the subcontractor: planning, scheduling, reporting, time & cost control, and claims analysis.
View case study
Efad Residential Complex
5th Settlement, New Cairo, Egypt~460 separate and attached villas plus fences, external networks, roads, landscaping, lakes and service areas.
PM for the main contractor: planning, scheduling, reporting, and time & cost control.
View case study
Al Oroba Towers
Ring Road, Cairo, EgyptA three-stage tourist, residential, commercial and entertainment compound — residential buildings and mall, then hotel apartments and parking, then a 5-star hotel.
PM for design and construction phases: design coordination, planning, scheduling, cost estimating, bid letting, contract administration and time & cost control.
View case study
Lagovesta Residential Complex
5th Settlement, New Cairo, Egypt60 separate and attached villas with fences, external networks, roads, landscaping, lakes and services.
PM for the owner: planning, scheduling, time & cost control, and reporting.
View case study
Residential / Administration Tower — A5
Maadi, Cairo, EgyptOwned by Arab Contractors for Investment — a 50-storey tower over a 30,000 m² built-up area (design completed).
PM services to the owner's general consultant: planning, scheduling, cost estimating, value engineering, coordination, contract administration and time & cost control.
View case study
SwanLake Residence — New Cairo
New Cairo, EgyptA gated residential compound in New Cairo — standalone villas, townhouses and apartment clusters set around landscaped spines and community amenities.
Planning, scheduling and control; cash-flow forecasting; delay analysis; contract management; claims analysis.
View case study
Residential Buildings — Waraa Island
Waraa Island, Giza, EgyptConstruction of five multi-storey residential buildings on Waraa Island in the Nile, delivering apartments across a mixed-density residential cluster.
HG-Contracting scope: concrete works for the buildings and masonry works.
View case study
Mountain View — I-City
New Cairo, EgyptTen-storey residential buildings inside the Mountain View I-City master development in New Cairo.
HG-Contracting scope: masonry works for six floors of the building.
View case study
Residential Building — El Shorouk
El Shorouk City, EgyptA five-storey residential building in El Shorouk City delivering apartments with full envelope, MEP and finishing packages.
HG-Contracting scope: concrete works, electrical works, mechanical works, façade and finishing works.
View case study
West Side Project — Hurghada
Hurghada, EgyptSeven-storey residential buildings within the West Side resort-residential development in Hurghada, overlooking the community pool decks.
HG-Contracting scope: renovation of two building façades — gypsum works, painting works and flooring works.
View case study
Elite Beach Resort
Ras Sudr, Egypt2,474 residential units and a 150-room hotel with restaurants, retail, swimming pools and health club across 600,000 m².
Complete project management for the owner: scheduling, cost estimating, cash-flow forecasting, procurement, bid analysis and evaluation, time and cost control, and quality assurance.
View case study
Medilink Resort
Safaga, EgyptA medical resort on 150,000 m² comprising 104 bungalows, 150 time-share units, two medical buildings and 40 luxury villas.
Management of preliminary and design phases: feasibility study, design management and coordination, planning and scheduling, procurement and cost estimating.
View case study
SwanLake Resort — North Coast
North Coast, EgyptA beach-front resort development on Egypt's North Coast combining chalets, guest suites and shared leisure amenities around lagoons and pool decks.
Planning, scheduling and control; cash-flow forecasting; delay analysis; contract management; claims analysis.
View case study
CFC Southern Business Parks C, D & F
Cairo Festival City, EgyptTen office buildings on parcels 13C01/02, 14B02, 12B01/02, 14D01/02 plus two double-wing offices on parcels 13C03 and 12B03.
PM services to the employer: project administration, integration, scope, time, cost, quality, HR, communications, risk, change, claims and health & safety management.
View case study
Cairo Festival City Gateway
Cairo Festival City, EgyptA mixed-use offices and retail gateway on a highly visible corner plot fronting the Ring Road and 90th Street.
Complete design and project management consultancy: design coordination and management, tender preparation, contractor selection, and full PMC across all knowledge areas.
View case study
One Ninety — Parcels A, B, D
New Cairo, EgyptFinishing works for three administrative parcels within the One Ninety project.
Complete planning and contract-administration services to the contractor.
View case study
Golden Pyramids Plaza (City Stars)
Nasr City, Cairo, EgyptA tourist, residential, commercial and entertainment compound of 114,755 m² — 5-star hotel, hotel apartments, residential and administrative towers, and a commercial centre delivered in two stages.
Consultant to the National Bank of Egypt: cost estimation, value of work performed and remaining, financial and technical evaluation, and periodic progress reporting.
View case study
International Commercial Center
Cairo–Alexandria Desert Road, EgyptA 70,940 m² built-up centre including a mall, hypermarket, underground garages, retail, cinemas, restaurants and a hotel.
Complete project management for the owner: design management and coordination, planning, procurement, cost estimation and control, bid analysis and evaluation, contract administration, quality assurance and construction management.
View case study
Commercial International Bank — Hurghada Branch
Hurghada, EgyptFinishing works for CIB's Hurghada branch on a 540 m² plot; project cost ~200,000,000 EGP.
PM services for the owner: planning, scheduling, cost estimating, value engineering, coordination, contract administration and time & cost control.
View case study
Smart Zone
Maadi, Cairo, EgyptA Ministry of Communication and IT high-tech administration complex modelled on Smart Village — phase one covered networks, infrastructure, landscaping and external works.
PM for the phase-one main contractor: planning, scheduling, time & cost control, reporting and contract administration.
View case study
Administrative Building for Small Companies (B115)
Smart Village, EgyptBasement, ground floor and three typical floors totalling ~14,400 m² of shaded area.
PM for the main contractor: planning, scheduling, cost estimating, reporting and updating.
View case study
National Telecommunication Institute
Smart Village, EgyptA ~20,000 m² administrative building with several typical floors; project cost ~90 million EGP.
PM for the main contractor: planning, scheduling, quantity surveying, cost estimating, reporting and updating.
View case study
Raya Holding Office Building
Smart Village, EgyptTwo basements, ground floor and three typical floors on ~1,500 m² of land; project cost ~43 million EGP.
PM for the main contractor: planning, scheduling, quantity surveying, cost estimating, reporting and updating.
View case study
El Montada Office Building
Smart Village, EgyptTwo basements, one ground floor and three typical floors — estimated project cost ~70 million EGP.
Joint venture with PACER Consultants for the owner: planning, scheduling, cost estimating, value engineering, coordination, contract administration, time & cost control and quality assurance.
View case study
NAMAA Administrative Building
5th Settlement, New Cairo, EgyptNew administrative building with three basements (5,500 m² each), ground floor, six repetitive floors and roof (1,715 m² each).
PM services for the owner: planning, scheduling, cost estimating, reporting and contract administration.
View case study
Cairo & Alexandria Stock Exchange Building
Cairo, EgyptTwo separate towers linked with a steel structure — three basements, ground and three typical floors, plus a second tower of two basements, ground and three typical floors. Expected duration 18 months, cost ~124M EGP.
PM services for the owner: planning, scheduling, cost estimating, coordination and contract administration.
View case study
GIS Administrative Building — Suez
Suez, EgyptAdministrative building of ground floor and repeating floors with renovation of a pre-existing building plus site works, fences and electro-mechanical networks.
PM for the owner: planning, scheduling, cost estimating, reporting and contract administration.
View case study
Down Town Cairo Commercial Mall
Down Town Cairo, EgyptA commercial mall located in down-town Cairo comprising tens of shops, restaurants and parking areas.
PM services for the owner: planning, scheduling, time & cost control and contract administration.
View case study
Cairo Festival City — Office Buildings
Cairo Festival City, EgyptGrade-A office buildings within the Cairo Festival City mixed-use master plan, delivering leasable floor plates alongside the retail, hospitality and residential clusters.
Full PM services: planning, scheduling, monitoring and control; delay analysis; reporting, claims and contract administration; safety and risk management.
View case study
Hurghada International Airport — New Terminal
Hurghada, EgyptA state-of-the-art main terminal building for passengers with supporting buildings (garbage transfer station, kiosks) plus runways and taxiways for the airport.
PM services for the main contractor: planning, scheduling, time control, reporting and claims.
View case study
El-Azhar Park
Cairo, EgyptA 29-hectare major urban park with planting areas, recreational and leisure facilities, theatre, two major dining facilities and administrative buildings.
PM services for the Geotechnical, Geomembrane and Hardscape 1 & 2 contractors: planning, time scheduling, control and updating, document control, resource allocation and levelling, cash-flow forecasting and performance measurement.
View case study
Nozha International Airport
Alexandria, EgyptRenovation and upgrading of the old main building, a new extension and a new office building, plus air and landside works.
Internal consultant for PM services to the general contractor: planning, scheduling, reporting, time & cost control, contract administration and claim analysis.
View case study
Knauf Plaster Boards & Gypsum Plant
Suez, EgyptA gypsum plasters plant factory in Suez comprising 22 buildings, layout and fence on 140,000 m² of land.
PM services for the owner: contract administration and reporting.
View case study
Syrup & Milk Factory
6 October Industrial Zone, EgyptProduction building, administration building, stores, social building, tanks, utilities buildings, infrastructure and site works.
PM services for the owner: planning, scheduling, cost estimating, procurement and contract administration.
View case study
Cement Factory — Aswan
Aswan, EgyptA cement factory in Aswan comprising quarry, raw material storage, raw mill area, clinker area, cement mill area and packing area — project cost ~1 billion EGP.
PM services for the owner: planning, scheduling, cost estimating, procurement and contract administration.
View case study
El-Khamail Urban Development
Sheikh Zayed City, EgyptMinistry of Interior Affairs development on ~800,000 m². Phase 2 covers earth work, urban planning, infrastructure (sewage, water, fire fighting, electrical), roads and landscaping.
PM services for the owner: planning, scheduling, cost estimating and contract administration.
View case study
Industrial Factory Building
EgyptA factory over 11,000 m² including production hall, two-floor administration, water tank, LPG tank, electrical room for main panel board, transformers, emergency generator, fences and gates.
PM for the owner: planning, scheduling, cost estimating, procurement and contract administration.
View case study
Warner Lewis Fuel Hydrant Pipelines
EgyptTwo pipelines for Al-Majd / Warner Lewis Egypt — a 24" pipeline extending 3,000 m and a 14" pipeline extending 3,200 m.
PM services for the contractor: planning, scheduling, time & cost control and reporting.
View case study
Cairo Unplanned Neighborhoods Utilities
Cairo, EgyptDevelopment of the unplanned impoverished neighborhoods in Cairo — water supply network of 11,800 m and sewerage system lines of 6,000 m.
PM for the contractor: planning, scheduling, time & cost control and contract administration.
View case study
Minia Potable Water Supply
Minia, Egypt50% potable water supply for Minia city — underground reservoir, tanks, filter, chlorination building and two pumping stations, executed in traditional fair-face technique.
PM services for the owner: planning, scheduling, cost estimating and contract administration.
View case study
Cairo–Suez Highway Bridge (Km 26)
Cairo–Suez Highway, EgyptA 153 m long, 60 m wide bridge with two approaches, eight ramps and five spans — outer spans in concrete box sections and intermediate spans in steel. Overall length including roads and ramps ~3,500 m.
PM for the contractor: planning, scheduling, time & cost control and reporting.
View case study
Kemet Factory for Food Industries
EgyptExtension of the Kemet food-industries factory with two additional storage buildings, plus renovation of the existing production facility.
HG-Contracting scope: excavation works, concrete works, finishing works and electrical works.
View case study
Sheikh Zayed Hospital Complex
Sheikh Zayed City, EgyptA 35,000 m² site with ~70,000 m² of construction — out-patient clinics, staff and doctors housing, senior residence villas, service buildings, main building, gates, fences and external coordination works.
PM for the owner: planning, scheduling, cost estimating, contract administration and time & cost control.
View case study
Nile University
Sheikh Zayed City, EgyptA Ministry of Communication and IT flagship university and research centre — phase one includes two educational buildings, administration, staff and student building, service building, networks, infrastructure, landscaping and external works.
PM services for the owner: planning, scheduling, cost estimating, reporting and contract administration.
View case study
Sheikh Zayed Cancer Hospital
Sheikh Zayed City, EgyptA specialised cancer hospital planned for 1,020 internal beds, 500 day-treatment beds, 60 major operating rooms, 15 radiation-therapy devices and an integrated advanced cancer research centre with laboratories.
PM services for the owner: planning, scheduling, cost estimating, reporting and contract administration.
View case study
Canal Stadium & Adjacent Mosque
Ismailia, EgyptFinishing works for the first-class and elite-class areas of Canal Stadium, plus construction of the mosque adjacent to the stadium.
PM for the contractor: planning, scheduling, time & cost control and reporting.
View case study
Sporting Club — Full Construction Scope
EgyptInfrastructure (electrical, irrigation), club house, gate & fence, squash building, mosque, game lounge, lockers, electrical & transformer rooms, CCTV room, food court, fire/water tanks, gym, training pool & pump room, landscape and gate.
Full construction PM: planning, scheduling, procurement, cost control, contract administration and quality assurance.
View case study
Egyptian Shooting Club
EgyptA 61-acre club with swimming pools complex, social building, shooting services building, shooting courts, fences, gates and infrastructure.
PM for the owner: planning, scheduling, cost estimating and contract administration.
View case study
Girls' College
EgyptAn integrated academic institution combining humanities, basic, applied and educational sciences and child studies — built-up area ~3,350 m².
PM services for the owner: planning, scheduling, cost estimating and contract administration.
View case study
Technological & Industrial Relations University
EgyptA specialised university in technological development and industrial relations — built-up area ~10,000 m².
PM services for the owner: planning, scheduling, cost estimating and contract administration.
View case study
Al-Saleh Mosque
Sana'a, YemenThe largest mosque in Sana'a, owned by the Yemeni Ministry of Construction & Housing — 27,500 m² footprint, 13,500 m² central hall, 5 domes and 6 minarets. Project cost ~600M USD.
PM services for the main contractor: planning, scheduling, reporting, time & cost control and claims analysis.
View case study
Examinations Building
EgyptAn examination building for 6,000 students — ground floor and four typical floors, ~28,000 m² shaded area with ~20,000 m² of halls, service rooms, three main stairways and two emergency exits. Scope includes electromechanical and landscape works.
PM services for the owner: planning, scheduling, cost estimating, reporting and contract administration.
View case study
College of Engineering Building
EgyptA college on 12,000 m² of land with one basement, ground and four typical floors — lecturing halls, auditorium, laboratories, administration, staff offices and service areas.
PM services for the owner: planning, scheduling, cost estimating and contract administration.
View case study