All projects
Residential

Kattameya Hills

5th Settlement, New Cairo, Egypt
Sector
Residential
Location
5th Settlement, New Cairo, Egypt
HG Role
PM for the general contractor
Services Delivered
3 disciplines
Project overview

A case study in delivery.

A residential complex of 105 separate, attached and town-house villas with fences, external networks, roads, landscaping, lakes and service areas.

HG Scope of Work

PM for the general contractor: planning, scheduling, and time & cost control.

01 · Context

The brief.

Large residential programmes live and die on repetition, cash-flow discipline and on-time hand-over of finished homes. HG applied a structured PM system to plan the works at building, cluster and community levels — sequencing infrastructure, superstructure, MEP and hand-over trades so units could be released to owners in coordinated tranches.

02 · Approach

Execution.

Delivery was organised by cluster and floor, with rolling four-week look-aheads driving crew allocation and material call-off. Contract administration, claims analysis and quality inspections ran in parallel so hand-over packs were complete when units were physically ready.

03 · Outcome

Completion.

Homes were handed over in structured tranches with defect rates within owner tolerance, supported by a full record of scope changes, valuations and progress backup. Repeat business followed on adjacent phases.

Scope in detail

Every discipline HG performed on this engagement.

The full engagement scope, grouped by discipline. Each item was executed by the relevant HG subsidiary or an integrated delivery team on behalf of the owner, contractor or consortium.

01 · Planning & Scheduling
2 items
  • Planning
  • Scheduling
02 · Cost & Commercial
1 item
  • Time & cost control
Visual record

Project photography.

A visual record of the asset, its construction milestones and finished environments. Full project photography and additional reference material available on request.

Kattameya Hills — feature
Signature view
Envelope & finishes
Interior programme
Construction progress
Material & detail
Delivered environment
Site & context

Reference imagery · Full project photography available on request