Four Seasons — Madinaty
A case study in delivery.
A 5-star Four Seasons hotel within the Madinaty master development — guest rooms, ballroom, F&B outlets and resort-style pools and gardens.
PM consultant: baseline programme (Primavera P6), WBS development, critical-path identification, resource histogram and S-curve, cash-flow analysis.
The brief.
The Four Seasons Madinaty required a rigorous planning baseline inside a larger master development, with the owner needing Primavera P6-based programme control and cash-flow visibility.
Execution.
HG built the baseline programme in Primavera P6, developed the WBS, identified the critical path, produced resource histograms and S-curves, and analysed cash flow.
Completion.
The owner received a robust planning baseline, clear critical-path visibility and resource and cash-flow curves to support funding and contractor management.
Every discipline HG performed on this engagement.
The full engagement scope, grouped by discipline. Each item was executed by the relevant HG subsidiary or an integrated delivery team on behalf of the owner, contractor or consortium.
- Resource histogram
- Cash-flow analysis
- Baseline programme (Primavera P6)
- WBS development
- Critical-path identification
- S-curve
Project photography.
A visual record of the asset, its construction milestones and finished environments. Full project photography and additional reference material available on request.