Raya Holding Office Building
A case study in delivery.
Two basements, ground floor and three typical floors on ~1,500 m² of land; project cost ~43 million EGP.
PM for the main contractor: planning, scheduling, quantity surveying, cost estimating, reporting and updating.
The brief.
Commercial assets carry hard revenue milestones — lease commencement, anchor tenant fit-out, mall opening. HG delivered an integrated PM system covering scope, time, cost, quality, risk and HSE, keeping the employer positioned to satisfy tenant, lender and operator obligations without compromising building quality.
Execution.
The engagement combined design management, tender leadership and full construction PMC. HG chaired coordination workshops, resolved interface risk early in shop-drawings and BIM, and gave the employer a single dashboard covering programme, cost, quality and HSE performance.
Completion.
The employer entered the leasing and fit-out phase with a complete, closed-out delivery record — including as-built information, warranties and financial reconciliation — enabling anchor and speciality tenants to mobilise on plan.
Every discipline HG performed on this engagement.
The full engagement scope, grouped by discipline. Each item was executed by the relevant HG subsidiary or an integrated delivery team on behalf of the owner, contractor or consortium.
- Planning
- Scheduling
- Reporting
- Cost estimating
- Quantity surveying
- Updating