All projects
Administrative & Commercial

Cairo Festival City — Office Buildings

Cairo Festival City, Egypt
Sector
Administrative & Commercial
Location
Cairo Festival City, Egypt
HG Role
Full PM services
Services Delivered
10 disciplines
Project overview

A case study in delivery.

Grade-A office buildings within the Cairo Festival City mixed-use master plan, delivering leasable floor plates alongside the retail, hospitality and residential clusters.

HG Scope of Work

Full PM services: planning, scheduling, monitoring and control; delay analysis; reporting, claims and contract administration; safety and risk management.

01 · Context

The brief.

Commercial assets carry hard revenue milestones — lease commencement, anchor tenant fit-out, mall opening. HG delivered an integrated PM system covering scope, time, cost, quality, risk and HSE, keeping the employer positioned to satisfy tenant, lender and operator obligations without compromising building quality.

02 · Approach

Execution.

The engagement combined design management, tender leadership and full construction PMC. HG chaired coordination workshops, resolved interface risk early in shop-drawings and BIM, and gave the employer a single dashboard covering programme, cost, quality and HSE performance.

03 · Outcome

Completion.

The employer entered the leasing and fit-out phase with a complete, closed-out delivery record — including as-built information, warranties and financial reconciliation — enabling anchor and speciality tenants to mobilise on plan.

Scope in detail

Every discipline HG performed on this engagement.

The full engagement scope, grouped by discipline. Each item was executed by the relevant HG subsidiary or an integrated delivery team on behalf of the owner, contractor or consortium.

01 · Planning & Scheduling
3 items
  • Planning
  • Scheduling
  • Reporting
02 · Cost & Commercial
1 item
  • Claims
03 · Procurement & Contracts
1 item
  • Contract administration
04 · Governance & Advisory
1 item
  • Risk management
05 · Additional Services
4 items
  • Monitoring
  • Control
  • Delay analysis
  • Safety
Visual record

Project photography.

A visual record of the asset, its construction milestones and finished environments. Full project photography and additional reference material available on request.

Cairo Festival City — Office Buildings — feature
Signature view
Envelope & finishes
Interior programme
Construction progress
Material & detail
Delivered environment
Site & context

Reference imagery · Full project photography available on request